Your fund-raiser dollars at work
Over the past few years we have made a number of improvements to our facility. Listed below are just a few of the improvements made over the years.
2023
Four brand new fields in a clover formation with a pavillion in the center.
New Parking lot, closer to fields 1-4.
2022
Continuation of the four new diamonds and parking lot being built. Check back in Spring 2023 for the completion!
Credit card machine installed at the concession stands. New weed wacker and blower added. New flag pole and flag installed.
2021
Four new fields are currently being built. The four new diamonds will be adjacent to field 6, built in a clover formation. New parking lot is being created closer to fields for an easier walk. Be on the lookout for new batting cages and pitching mounds in the summer of 2022.
2016 - 2017
Two new fields were built with irrigation and drainage. These state of the art fields are behind field 3 and field 5. These new fields give greater scheduling flexibility and more options for team practices.
2014 - 2015
New dome backstops were installed on all diamonds for increased safety.
2012-2013
Completed Renovations on Diamond #2(field)Upgraded Safety Netting on Field #3 & #4
2011-2012
Aquired Diamond #2Purchased 3-wheel diamond groomer
2010-2011
Purchased new infield dragger
2009-2010
new sheds for equipment storage
Fixed netting on Aud 3 and 4
Placed 150 tons of clay infield mix on the S. Long St. diamond
Purchased 2 new pitching machines for AA
Fenced entire perimeter of fields 3, 5 and 6
2008-2009
New roof on the concession stand
New Grill and Fryer for concession stand
2007-2008
Blacktop the Aud 5 and Aud 6 dugouts
New benches for Aud 5 and Aud 6 dugouts
Blacktop the concession stand area
2006-2007
New Scoreboards on Aud 3, 4, 5 and 6
Dugout covers for Aud 5 and Aud 6
Spectator bleachers repaired
Netting installed around backstop on Aud 4
Replace fence posts on Aud 4
2005-2006
Dugout covers on Aud 3
Netting installed around backstop on Aud 3, 5 and 6